How to repair ribbon busbar interruptions in solar PV panels

Google+ Pinterest LinkedIn Tumblr +

 

  • A group of researchers led by Spain’s Centre for Energy, Environmental and Technological Research (CIEMAT) has developed a set of techniques to repair ribbon busbar interruptions in photovoltaic panels.

“Interruptions between cells account for 10% of module failures,” the research’s lead author, Félix García Rosillo, told pv magazine. “Repairing interruptions can be performed using conventional hand tools and may help recover most of a module’s nominal power.”

The scientists presented two different repair methods. The first requires the complete removal of the module backsheet, the replacement of the damaged busbars, and the placement of a new backsheet. The second requires the removal of the backsheet in the damaged area, the soldering the busbar and sealing via silicone resin.

Both techniques do not require the acquistion of expensive electroluminescence (EL) images of the panels before and after repair. “It is important to clarify that it is not possible to obtain EL images from a module affected by twin ribbon busbar interruptions,” the scientists noted. “If current tries to flow between solar panel contacts, connected to a power supply and two of the cells are affected by a total ribbon busbar interruption, the current will not flow and consequently, it will not be possible to obtain the EL image.”

The academics explained that by removing the diodes from the junction box and checking the electrical connections between the different terminals in the junction box at the time of the EL measurement, images of non-affected series of cells can be obtained. They also warned that, in pre-repair EL images, only the active series of cells are visible to the camera. “When the module is repaired, the EL image reveals all cells and it is possible to know their actual state,” they added.

The repair process requires the use tone testers or cable locators to allow the precise identification of the twin interrupted cell interconnection. “A tone tester that can perform this task can cost as low as few more than two tens of euros,” the team said. “A similar result can be achieved by using a current detector to locate single bus bar cell interruptions, also at low cost and with a fast procedure.”

The final repair step can be executed through conventional handicraft tools like mini rotary drill tools such as grit sanding bands or conventional soldering tools. “A soldering paste and ribbon bus bar complements prove to be a good option for repairing the ribbon bus bar interruptions,” the researchers stressed.

After repair, the proposed method requires the implementation of an IV curve measurement to ascertain how much power output has been recovered.

The research group conducted a series of tests on three 215 W modules produced in 2006 by German manufacturer Qcells and found that, in some cases, it is possible to multiply the power production of the damaged modules by four times.

“Safety must be an important objective when repairing PV module, and any repaired module that does not pass some basic safety tests, must be decommissioned and recycled,” they said, referring to the initial selection that should be made to avoid risks for installers.

The new technique was introduced in the paper “Repairing ribbon bus bar interruptions in photovoltaic modules using non-intrusive interruption location,” published in Renewable Energy. “This methodology can be applied in modestly equipped factories or laboratories, lowering the economic cost of repairing PV modules,” the academics concluded

Author: Emiliano Bellini

This article was originally published in pv magazine and is republished with permission.

Share.

Leave A Reply

About Author

Green Building Africa promotes the need for net carbon zero buildings and cities in Africa. We are fiercely independent and encourage outlying thinkers to contribute to the #netcarbonzero movement. Climate change is upon us and now is the time to react in a more diverse and broader approach to sustainability in the built environment. We challenge architects, property developers, urban planners, renewable energy professionals and green building specialists. We also challenge the funding houses and regulators and the role they play in facilitating investment into green projects. Lastly, we explore and investigate new technology and real-time data to speed up the journey in realising a net carbon zero environment for our children.