- Eskom has issued a tender for the design, supply, installation, commissioning, operation and maintenance of Solar PV plant with capacity of up to 30 MW for Komati Power Station.
The EPC contractor will survey, design, manufacture, procure and supply all materials and labour for the solar project Eskom is planning. The development will be situated across four continuous land parcels all in proximity to each other.
The contractor will be expected to provide detailed documentation of design drawings to Eskom, as well as maintenance manuals and instructions for a solar PV single-axis tracker system. This includes an 18-month operation and maintenance service and network integration equipment.
The deadline for contractors to apply is February 13 2025.
Link to the tender documents HERE
Good luck!
Author: Bryan Groenendaal